Back to Partnership Profiles Index

Bates Troy

Binghamton, NY

Scope of Work:

Armstrong Service owns and services the steam generation assets and maintains the corresponding distribution system throughout the Bates Troy facility.

The total peak steam capacity is 15,000 lbs/hr.

ASI services and supports all the utility operations including utility bill tracking and payment, recognizing areas of inefficiency, and regular energy use reporting.

Upgrade Projects:

  • Recovered all vented flash steam
  • Engineered and installed steam distribution line modifications
  • Installed automation for chemical feed system to the boiler
  • Replaced all defective steam traps
  • Corrected all live steam/condensate leaks
  • Insulated all bare piping

Contract:

The total value of this Agreement is $600,000.

Time of Service:

10 year Service and Support Term began January, 2000.

Benefits:

Gas consumption has been reduced by 20% (with 5% increase in production).

Electric consumption has been reduced by 13%.